Equipment Status

본문 바로가기

Introduction Of Company

Leading Enterprise of Railroad Culture CHUNWUN RAILROAD

  • Equipment Status
  • Equipment Status

    Track Equipment

    Track Equipment
    Name Type Measure Number Remark
    Motorcar 182PS/2500r.p.m Unit 2 -
    Trolley 5TON and others Unit 8 -
    Hand Tie-Tamper 220V/60HZ/3PH Unit 10 -
    Power Wrench 8HP Unit 8 -
    Engine Impact 1,030Nm Unit 14 -
    Track Lifter 10TON Unit 2 -
    Generator 7km and others Unit 15 -
    Rail Cutter 5HP/16” Unit 21 -
    Rail Carrier - Unit 6 -
    Portal Crane - Group 42 -
    Rail Drilling Machine 3HP Unit 12 -
    Rail Jack 15Ton Unit 48 -

    * Filled with only major equipments

    Welding Equipment

    Welding Equipment
    Name Type Measure Number Remark
    Gas Pressure Welding Machine TGP-5/KGP-6 SET 2 -
    Thermit Machine - SET 4 -
    Shearing Machine EME-1 and others Unit 4 -
    Grinding Machine - Unit 4 -
    Face Grinding Machine - Unit 8 -
    Generator 30KW Unit 2 -
    Winch 2.1KW Unit 2 -

    * Filled with only major equipments

    Inspection & Measurement Equipment

    Inspection & Measurement Equipment
    Name Type Measure Number Remark
    Ultrasonic Flow Detector AND SET 1 -
    Hardness Tester - SET 1 -
    Magnetic Particle Tester MP-3 SET 1 -
    Track Master RCS SET 4 -
    Compression Tester - SET 2 -
    Airometer - SET 2 -
    Total Station DTM-520 SET 3 -
    Auto Level Instruction AC-2 SET 3 -

    * Filled with only major equipments


    404-3, Shincheon-dong, Dong-gu, Daegu, Korea
    TEL : 053-744-8373|FAX : 053-751-7764|Email : chunwun@chunwun.com|Corporate Registration No. : 502-81-47209
    Copyright © 2016 CHUNWUN RAILROAD CORPORATION. All rights reserved.
    TOP